<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[HES Earthmoving Ltd.]]></title><description><![CDATA[HES Earthmoving Ltd.]]></description><link>https://www.hesearthmoving.co.nz/projects</link><generator>RSS for Node</generator><lastBuildDate>Thu, 21 May 2026 22:30:32 GMT</lastBuildDate><atom:link href="https://www.hesearthmoving.co.nz/blog-feed.xml" rel="self" type="application/rss+xml"/><item><title><![CDATA[Metal Cartage]]></title><description><![CDATA[We offer cost-effective carting, delivering high-quality results across diverse project requirements, we have experienced operators and a modern fleet ready for your next project.]]></description><link>https://www.hesearthmoving.co.nz/post/metal-cartage</link><guid isPermaLink="false">69f911285caf4ed272bb21f7</guid><pubDate>Mon, 04 May 2026 21:36:50 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_01dc6372cf0d44339b98bb4beb635163~mv2.jpg/v1/fit/w_960,h_540,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Civil Earthworks]]></title><description><![CDATA[Our civil construction team undertakes diverse civil projects. From building and maintaining council roads to subdivisions and carpark preparation.]]></description><link>https://www.hesearthmoving.co.nz/post/civil-earthworks</link><guid isPermaLink="false">69f9109e5caf4ed272bb20c3</guid><pubDate>Mon, 04 May 2026 21:35:04 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_62bf52a174114c77a0d9ddd31120b76c~mv2.jpeg/v1/fit/w_768,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Forestry Roading]]></title><description><![CDATA[Our Forestry team specialises in forestry roading and skid site construction, maintenance, and infrastructure planning. Being able to supply and cart metal means we can cover the job from start to finish.]]></description><link>https://www.hesearthmoving.co.nz/post/forestry-roading</link><guid isPermaLink="false">69f90fed7c961ad0b9fbb23d</guid><pubDate>Mon, 04 May 2026 21:32:45 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_d5d4c672cc2b4fe1b2e7b235c8dfb874~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Farm Work]]></title><description><![CDATA[Our team carries out general farm earthworks, including building dams and tracks, clearing scrub, contouring paddocks, and installing efficient farm water systems.]]></description><link>https://www.hesearthmoving.co.nz/post/farm-work</link><guid isPermaLink="false">69f90e437c961ad0b9fbae66</guid><pubDate>Mon, 04 May 2026 21:25:32 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_4cb78d01a30b4b0eb779591ca7b5c03d~mv2.jpg/v1/fit/w_565,h_383,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Drainage and Dams]]></title><description><![CDATA[Our Drainage team combines skilled people, modern technology, and a proven track record to successfully deliver both small and large projects across all areas of civil construction infrastructure.]]></description><link>https://www.hesearthmoving.co.nz/post/drainage-and-dams</link><guid isPermaLink="false">69f90d62a09b06483d3e5e2b</guid><pubDate>Mon, 04 May 2026 21:22:31 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_a322a17a84d2417ba302c2b116a4d4c7~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Subdivisions]]></title><description><![CDATA[Our team delivers a complete range of subdivision services, including road construction, pipe installation, and preparation of general house sites for residential development.]]></description><link>https://www.hesearthmoving.co.nz/post/subdivisions</link><guid isPermaLink="false">69f90bd75caf4ed272bb1583</guid><pubDate>Mon, 04 May 2026 21:15:19 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_16070ffa4dbc41d6b3cb29493d4869ef~mv2.jpg/v1/fit/w_276,h_155,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Crushing &#38; Screening]]></title><description><![CDATA[Our Crushing team offers full capabilities in crushing and screening aggregates and lime rock, and can also extract materials or screen drainage material, topsoil, and lime for other companies.]]></description><link>https://www.hesearthmoving.co.nz/post/crushing-screening-services</link><guid isPermaLink="false">69f90a31b27e981e27c513c6</guid><pubDate>Mon, 04 May 2026 21:11:14 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_5b82b862e4094507bb8a2031ee55e302~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Transport]]></title><description><![CDATA[Our Transport team provides a wide range of opt ions for moving heavy machinery and equipment safely, efficiently, and reliably across various project sites.]]></description><link>https://www.hesearthmoving.co.nz/post/transport-services</link><guid isPermaLink="false">69f9091e5caf4ed272bb1031</guid><pubDate>Mon, 04 May 2026 21:05:44 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_9c5764bd6b6140df9f8e446f7893ad9e~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Fernhill Stopbank Reinstatement]]></title><description><![CDATA[Post Cyclone Gabrielle, we were engaged as the main contractor to repair the Stopbank at Fernhill, complete river channel enhancements, and rebuild roading to reconnect communities with vital supplies. This is highly relevant to the scope of works required for the HBRC Stop Banks. As there was still a high risk of further flooding to local landowners, we rapidly (with one day’s notice) mobilised 14 staff, six excavators (20-35t), three bulldozers (D8-D51), five 45t ATDs, two compaction...]]></description><link>https://www.hesearthmoving.co.nz/post/fernhill-stopbank-reinstatement</link><guid isPermaLink="false">69f55e407b1c42fb24f42784</guid><pubDate>Sat, 02 May 2026 02:16:08 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_e80ec3bb9c5d4d25af16d722adb27a17~mv2.jpeg/v1/fit/w_1000,h_575,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Makara Dams]]></title><description><![CDATA[Post cyclone Gabrielle, we were engaged for the silt removal at Makara Dams. Dam 4 has been completed with all silt (approx.19,000m³) removed, the spillway reinstated, and the site stabilised. Dam 1 has required the removal of approximately 34,000m³ of silt, carted from the dam to the dumpsite. The project experienced delays with heavy rain; however, HES adapted and continued work in full compliance and without any incidents.]]></description><link>https://www.hesearthmoving.co.nz/post/makara-dams</link><guid isPermaLink="false">69f55dab7b1c42fb24f4267c</guid><pubDate>Sat, 02 May 2026 02:14:49 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_ff8e7fe6f45c4f6b91b878143f82783f~mv2.jpg/v1/fit/w_565,h_383,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Marainanga Gorge Road Reconstruction]]></title><description><![CDATA[The entire road in this location was washed away by Cyclone Gabrielle. HES Earthmoving was the lead contractor on this project to reconstruct it from the bottom up including: Earthworks - Installation of gabion rock lining with geotextile in behind Rip rap protection Geogrid matting installed as fill progressed Pavement construction Metal surfacing This project involved working in and alongside a river in liaison with Iwi (Ngāti Kahungunu and Rangitāne), including the sourcing of river-won...]]></description><link>https://www.hesearthmoving.co.nz/post/marainanga-gorge-road-reconstruction</link><guid isPermaLink="false">69f55ba3bc097e2f92ea21c4</guid><pubDate>Sat, 02 May 2026 02:05:48 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_d1a10ddbe60245b7a97b150edce53cee~mv2.jpg/v1/fit/w_1000,h_697,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item><item><title><![CDATA[Gumtree Subdivision Enabling Works]]></title><description><![CDATA[HES Earthmoving was subcontracted to Downer to complete the preparatory civils and bulk earthworks for this subdivision project. The scope of works included stripping topsoil, extensive undercutting of unsuitable material (2-3m in depth due to large tree stumps and roots), importing fill metal, building the platform, with compaction testing as a hold point for each lift, and retopsoiling, as well as digging of the road channels.]]></description><link>https://www.hesearthmoving.co.nz/post/gumtree-subdivision-enabling-works</link><guid isPermaLink="false">69f55a64edf5696920d34ee5</guid><pubDate>Sat, 02 May 2026 02:01:04 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/c39891_cb5a36be74f643408a394e081975d77b~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mirage Visual</dc:creator></item></channel></rss>